[envira-gallery id=”3344″]
On 14 September at UNSW attendees, in teams were given a visual inspection report for a structure and the task to choose what further investigation was required.
After a short break for networking and an overview of remediation techniques, the teams needed to decide the most suitable remediation methods to ensure that the structure could return to service, achieve its intended design life and have the lowest costs for continuing maintenance.